CAEP Consortium Fiscal Reporting 31 Gateway Adult Education Network
Year: 2019-20
CAEP Consortium Fiscal Reporting 31 Gateway Adult Education Network
2019-20 Fiscal Year
Fiscal Report Submittal Status
Quarter 1 | Quarter 2 | Quarter 3 | Quarter 4 | |
---|---|---|---|---|
Dos Palos Oro Loma Joint Unified | Submitted | Submitted | Not Submitted | Not Submitted |
Gustine Unified | Submitted | Submitted | Not Submitted | Not Submitted |
Le Grand Union High | Submitted | Submitted | Not Submitted | Not Submitted |
Los Banos Unified | Submitted | Submitted | Not Submitted | Not Submitted |
Mariposa County Unified | Submitted | Submitted | Not Submitted | Not Submitted |
Merced CCD | Submitted | Submitted | Not Submitted | Not Submitted |
Merced Co. Office of Education | Submitted | Submitted | Not Submitted | Not Submitted |
Merced Union High | Submitted | Submitted | Not Submitted | Not Submitted |
Dos Palos Oro Loma Joint Unified
Dos Palos Oro Loma Joint Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $1,295 | $4,725 | 27.41% | $31,500 | 4.11% | $30,205 |
2000 - Non-Instructional Salaries | $512 | $375 | 136.53% | $2,500 | 20.48% | $1,988 |
3000 - Employee Benefits | $306 | $1,050 | 29.14% | $7,001 | 4.37% | $6,695 |
4000 - Supplies and Materials | $3,359 | $1,507 | 222.84% | $10,049 | 33.43% | $6,690 |
5000 - Other Operating Expenses and Services | $23,685 | $3,779 | 626.76% | $25,193 | 94.01% | $1,508 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $572 | 0% | $3,812 | 0% | $3,812 |
Totals | $29,157 | $12,008 | 242.81% | $80,055 | 36.42% | $50,898 |
- Status
- Submitted
Dos Palos Oro Loma Joint Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $15,505 | $9,450 | 164.07% | $31,500 | 49.22% | $15,995 |
2000 - Non-Instructional Salaries | $1,751 | $750 | 233.47% | $2,500 | 70.04% | $749 |
3000 - Employee Benefits | $3,309 | $2,100 | 157.55% | $7,001 | 47.26% | $3,692 |
4000 - Supplies and Materials | $9,378 | $3,015 | 311.08% | $10,049 | 93.32% | $671 |
5000 - Other Operating Expenses and Services | $25,089 | $7,558 | 331.96% | $25,193 | 99.59% | $104 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $1,144 | 0% | $3,812 | 0% | $3,812 |
Totals | $55,032 | $24,017 | 229.14% | $80,055 | 68.74% | $25,023 |
- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Frank Lemos
Dos Palos Oro Loma Joint Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $15,505 | $14,175 | 109.38% | $31,500 | 49.22% | $15,995 |
2000 - Non-Instructional Salaries | $1,751 | $1,125 | 155.64% | $2,500 | 70.04% | $749 |
3000 - Employee Benefits | $3,309 | $3,150 | 105.03% | $7,001 | 47.26% | $3,692 |
4000 - Supplies and Materials | $9,378 | $4,522 | 207.38% | $10,049 | 93.32% | $671 |
5000 - Other Operating Expenses and Services | $25,089 | $11,337 | 221.3% | $25,193 | 99.59% | $104 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $1,715 | 0% | $3,812 | 0% | $3,812 |
Totals | $55,032 | $36,025 | 152.76% | $80,055 | 68.74% | $25,023 |
- Status
- Unsubmitted
Dos Palos Oro Loma Joint Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $15,505 | $18,900 | 82.04% | $31,500 | 49.22% | $15,995 |
2000 - Non-Instructional Salaries | $1,751 | $1,500 | 116.73% | $2,500 | 70.04% | $749 |
3000 - Employee Benefits | $3,309 | $4,201 | 78.77% | $7,001 | 47.26% | $3,692 |
4000 - Supplies and Materials | $9,378 | $6,029 | 155.54% | $10,049 | 93.32% | $671 |
5000 - Other Operating Expenses and Services | $25,089 | $15,116 | 165.98% | $25,193 | 99.59% | $104 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $2,287 | 0% | $3,812 | 0% | $3,812 |
Totals | $55,032 | $48,033 | 114.57% | $80,055 | 68.74% | $25,023 |
- Status
- Unsubmitted
Gustine Unified
Gustine Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $5,306 | $0 | 100% | $38,617 | 13.74% | $33,311 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $35,214 | 0% | $35,214 |
3000 - Employee Benefits | $1,865 | $0 | 100% | $12,477 | 14.95% | $10,612 |
4000 - Supplies and Materials | $5,551 | $0 | 100% | $8,995 | 61.71% | $3,444 |
5000 - Other Operating Expenses and Services | $0 | $0 | 100% | $1,921 | 0% | $1,921 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $636 | $0 | 100% | $4,709 | 13.51% | $4,073 |
Totals | $13,358 | $0 | 100% | $101,933 | 13.1% | $88,575 |
Summary of Activities:
Staff expenses and class curriculum- Status
- Submitted
Gustine Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $13,792 | $0 | 100% | $38,617 | 35.71% | $24,825 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $35,214 | 0% | $35,214 |
3000 - Employee Benefits | $4,767 | $0 | 100% | $12,477 | 38.21% | $7,710 |
4000 - Supplies and Materials | $5,551 | $0 | 100% | $8,995 | 61.71% | $3,444 |
5000 - Other Operating Expenses and Services | $0 | $0 | 100% | $1,921 | 0% | $1,921 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $636 | $0 | 100% | $4,709 | 13.51% | $4,073 |
Totals | $24,746 | $0 | 100% | $101,933 | 24.28% | $77,187 |
Corrective Action Plan
Gustine will begin to utilize its "supplies and material" as of 3/1/2020. Prior to this, no material or supplies for students or the school were bought because of the uncertainty of funding for the 2019-2020 year. All efforts to purchase much needed material for the remaining year will be placed during this month so that spending percentages are met and students received the support they need with the necessary supplies that are not currently available. One major item, a curriculum item, will be bought after district board approval since amount is over district requirements. Additionally, because of report errors, Gustine was not able to claim indirect for 2nd Qtr., non-instructional salaries, or additional instructional salary(PM).Summary of Activities:
Second Quarter Expenditures includes instructional salaries(AM only), but no supplies or material or non-instructional salaries, or additional instructional salary(PM).- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Gustine Adult School Denise Rivera-Pantoja, Teacher
Gustine Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $13,792 | $0 | 100% | $38,617 | 35.71% | $24,825 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $35,214 | 0% | $35,214 |
3000 - Employee Benefits | $4,767 | $0 | 100% | $12,477 | 38.21% | $7,710 |
4000 - Supplies and Materials | $5,551 | $0 | 100% | $8,995 | 61.71% | $3,444 |
5000 - Other Operating Expenses and Services | $0 | $0 | 100% | $1,921 | 0% | $1,921 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $636 | $0 | 100% | $4,709 | 13.51% | $4,073 |
Totals | $24,746 | $0 | 100% | $101,933 | 24.28% | $77,187 |
- Status
- Unsubmitted
Gustine Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $13,792 | $0 | 100% | $38,617 | 35.71% | $24,825 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $35,214 | 0% | $35,214 |
3000 - Employee Benefits | $4,767 | $0 | 100% | $12,477 | 38.21% | $7,710 |
4000 - Supplies and Materials | $5,551 | $0 | 100% | $8,995 | 61.71% | $3,444 |
5000 - Other Operating Expenses and Services | $0 | $0 | 100% | $1,921 | 0% | $1,921 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $636 | $0 | 100% | $4,709 | 13.51% | $4,073 |
Totals | $24,746 | $0 | 100% | $101,933 | 24.28% | $77,187 |
- Status
- Unsubmitted
Le Grand Union High
Le Grand Union High Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $750 | $3,750 | 20% | $25,000 | 3% | $24,250 |
2000 - Non-Instructional Salaries | $5,527 | $2,166 | 255.17% | $14,440 | 38.28% | $8,913 |
3000 - Employee Benefits | $2,061 | $1,394 | 147.9% | $9,290 | 22.19% | $7,229 |
4000 - Supplies and Materials | $735 | $3,000 | 24.5% | $20,000 | 3.68% | $19,265 |
5000 - Other Operating Expenses and Services | $160 | $915 | 17.49% | $6,100 | 2.62% | $5,940 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $462 | $561 | 82.31% | $3,742 | 12.35% | $3,280 |
Totals | $9,695 | $11,786 | 82.26% | $78,572 | 12.34% | $68,877 |
Corrective Action Plan
Le Grand Adult School began fall classes the last week in September due to parents still working. We will make our percentage for the other three quarters for the year. Classes are now in session.- Status
- Submitted
Le Grand Union High Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $12,070 | $7,500 | 160.93% | $25,000 | 48.28% | $12,930 |
2000 - Non-Instructional Salaries | $13,045 | $4,332 | 301.13% | $14,440 | 90.34% | $1,395 |
3000 - Employee Benefits | $6,807 | $2,787 | 244.24% | $9,290 | 73.27% | $2,483 |
4000 - Supplies and Materials | $14,223 | $6,000 | 237.05% | $20,000 | 71.12% | $5,777 |
5000 - Other Operating Expenses and Services | $3,354 | $1,830 | 183.28% | $6,100 | 54.98% | $2,746 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $2,475 | $1,123 | 220.47% | $3,742 | 66.14% | $1,267 |
Totals | $51,974 | $23,572 | 220.49% | $78,572 | 66.15% | $26,598 |
- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Donna Alley
- Dan Silveira
Le Grand Union High Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $12,070 | $11,250 | 107.29% | $25,000 | 48.28% | $12,930 |
2000 - Non-Instructional Salaries | $13,045 | $6,498 | 200.75% | $14,440 | 90.34% | $1,395 |
3000 - Employee Benefits | $6,807 | $4,181 | 162.83% | $9,290 | 73.27% | $2,483 |
4000 - Supplies and Materials | $14,223 | $9,000 | 158.03% | $20,000 | 71.12% | $5,777 |
5000 - Other Operating Expenses and Services | $3,354 | $2,745 | 122.19% | $6,100 | 54.98% | $2,746 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $2,475 | $1,684 | 146.98% | $3,742 | 66.14% | $1,267 |
Totals | $51,974 | $35,357 | 147% | $78,572 | 66.15% | $26,598 |
- Status
- Unsubmitted
Le Grand Union High Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $12,070 | $15,000 | 80.47% | $25,000 | 48.28% | $12,930 |
2000 - Non-Instructional Salaries | $13,045 | $8,664 | 150.57% | $14,440 | 90.34% | $1,395 |
3000 - Employee Benefits | $6,807 | $5,574 | 122.12% | $9,290 | 73.27% | $2,483 |
4000 - Supplies and Materials | $14,223 | $12,000 | 118.53% | $20,000 | 71.12% | $5,777 |
5000 - Other Operating Expenses and Services | $3,354 | $3,660 | 91.64% | $6,100 | 54.98% | $2,746 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $2,475 | $2,245 | 110.24% | $3,742 | 66.14% | $1,267 |
Totals | $51,974 | $47,143 | 110.25% | $78,572 | 66.15% | $26,598 |
- Status
- Unsubmitted
Los Banos Unified
Los Banos Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $4,642 | $0 | 100% | $53,000 | 8.76% | $48,358 |
2000 - Non-Instructional Salaries | $199 | $0 | 100% | $800 | 24.88% | $601 |
3000 - Employee Benefits | $1,030 | $0 | 100% | $11,530 | 8.93% | $10,500 |
4000 - Supplies and Materials | $0 | $0 | 100% | $22,526 | 0% | $22,526 |
5000 - Other Operating Expenses and Services | $7,969 | $0 | 100% | $15,000 | 53.13% | $7,031 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $692 | $0 | 100% | $5,143 | 13.46% | $4,451 |
Totals | $14,532 | $0 | 100% | $107,999 | 13.46% | $93,467 |
Summary of Activities:
Q1 Report July-Sept 30th- Status
- Submitted
Los Banos Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $22,887 | $0 | 100% | $53,000 | 43.18% | $30,113 |
2000 - Non-Instructional Salaries | $421 | $0 | 100% | $800 | 52.63% | $379 |
3000 - Employee Benefits | $5,020 | $0 | 100% | $11,530 | 43.54% | $6,510 |
4000 - Supplies and Materials | $899 | $0 | 100% | $22,526 | 3.99% | $21,627 |
5000 - Other Operating Expenses and Services | $8,871 | $0 | 100% | $15,000 | 59.14% | $6,129 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $1,904 | $0 | 100% | $5,143 | 37.02% | $3,239 |
Totals | $40,002 | $0 | 100% | $107,999 | 37.04% | $67,997 |
Summary of Activities:
Updated Q2 1-13-2020: Alejandra Garibay- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Los Banos Unified School District Paul Enos, Assistant Superintendent
- Dr. Sean Richey Los Banos USD, Chief Academic Officer
- alejandra garibay
Los Banos Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $22,887 | $0 | 100% | $53,000 | 43.18% | $30,113 |
2000 - Non-Instructional Salaries | $421 | $0 | 100% | $800 | 52.63% | $379 |
3000 - Employee Benefits | $5,020 | $0 | 100% | $11,530 | 43.54% | $6,510 |
4000 - Supplies and Materials | $899 | $0 | 100% | $22,526 | 3.99% | $21,627 |
5000 - Other Operating Expenses and Services | $8,871 | $0 | 100% | $15,000 | 59.14% | $6,129 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $1,904 | $0 | 100% | $5,143 | 37.02% | $3,239 |
Totals | $40,002 | $0 | 100% | $107,999 | 37.04% | $67,997 |
- Status
- Unsubmitted
Los Banos Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $22,887 | $0 | 100% | $53,000 | 43.18% | $30,113 |
2000 - Non-Instructional Salaries | $421 | $0 | 100% | $800 | 52.63% | $379 |
3000 - Employee Benefits | $5,020 | $0 | 100% | $11,530 | 43.54% | $6,510 |
4000 - Supplies and Materials | $899 | $0 | 100% | $22,526 | 3.99% | $21,627 |
5000 - Other Operating Expenses and Services | $8,871 | $0 | 100% | $15,000 | 59.14% | $6,129 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $1,904 | $0 | 100% | $5,143 | 37.02% | $3,239 |
Totals | $40,002 | $0 | 100% | $107,999 | 37.04% | $67,997 |
- Status
- Unsubmitted
Mariposa County Unified
Mariposa County Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $13,680 | $0 | 100% | $98,038 | 13.95% | $84,358 |
2000 - Non-Instructional Salaries | $690 | $0 | 100% | $12,939 | 5.33% | $12,249 |
3000 - Employee Benefits | $2,798 | $0 | 100% | $25,605 | 10.93% | $22,807 |
4000 - Supplies and Materials | $376 | $0 | 100% | $12,850 | 2.93% | $12,474 |
5000 - Other Operating Expenses and Services | $365 | $0 | 100% | $35,000 | 1.04% | $34,635 |
6000 - Capital Outlay | $0 | $0 | 100% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $895 | $0 | 100% | $7,608 | 11.76% | $6,713 |
Totals | $18,804 | $0 | 100% | $197,040 | 9.54% | $178,236 |
- Status
- Submitted
Mariposa County Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $34,620 | $0 | 100% | $98,038 | 35.31% | $63,418 |
2000 - Non-Instructional Salaries | $1,762 | $0 | 100% | $12,939 | 13.62% | $11,177 |
3000 - Employee Benefits | $7,069 | $0 | 100% | $25,605 | 27.61% | $18,536 |
4000 - Supplies and Materials | $9,144 | $0 | 100% | $12,850 | 71.16% | $3,706 |
5000 - Other Operating Expenses and Services | $5,278 | $0 | 100% | $35,000 | 15.08% | $29,722 |
6000 - Capital Outlay | $0 | $0 | 100% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $2,894 | $0 | 100% | $7,608 | 38.04% | $4,714 |
Totals | $60,767 | $0 | 100% | $197,040 | 30.84% | $136,273 |
- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Kierstin Wight, Business Services Officer
- Norma Dwyer
- Tammy Kudela
Mariposa County Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $34,620 | $0 | 100% | $98,038 | 35.31% | $63,418 |
2000 - Non-Instructional Salaries | $1,762 | $0 | 100% | $12,939 | 13.62% | $11,177 |
3000 - Employee Benefits | $7,069 | $0 | 100% | $25,605 | 27.61% | $18,536 |
4000 - Supplies and Materials | $9,144 | $0 | 100% | $12,850 | 71.16% | $3,706 |
5000 - Other Operating Expenses and Services | $5,278 | $0 | 100% | $35,000 | 15.08% | $29,722 |
6000 - Capital Outlay | $0 | $0 | 100% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $2,894 | $0 | 100% | $7,608 | 38.04% | $4,714 |
Totals | $60,767 | $0 | 100% | $197,040 | 30.84% | $136,273 |
- Status
- Unsubmitted
Mariposa County Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $34,620 | $980 | 3,531.28% | $98,038 | 35.31% | $63,418 |
2000 - Non-Instructional Salaries | $1,762 | $129 | 1,361.77% | $12,939 | 13.62% | $11,177 |
3000 - Employee Benefits | $7,069 | $256 | 2,760.79% | $25,605 | 27.61% | $18,536 |
4000 - Supplies and Materials | $9,144 | $129 | 7,115.95% | $12,850 | 71.16% | $3,706 |
5000 - Other Operating Expenses and Services | $5,278 | $350 | 1,508% | $35,000 | 15.08% | $29,722 |
6000 - Capital Outlay | $0 | $50 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $2,894 | $76 | 3,803.89% | $7,608 | 38.04% | $4,714 |
Totals | $60,767 | $1,970 | 3,083.99% | $197,040 | 30.84% | $136,273 |
- Status
- Unsubmitted
Merced CCD
Merced CCD Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $23,379 | $13,521 | 172.91% | $90,138 | 25.94% | $66,759 |
2000 - Non-Instructional Salaries | $38,339 | $23,660 | 162.04% | $157,735 | 24.31% | $119,396 |
3000 - Employee Benefits | $35,844 | $21,656 | 165.51% | $144,376 | 24.83% | $108,532 |
4000 - Supplies and Materials | $1,656 | $5,899 | 28.07% | $39,328 | 4.21% | $37,672 |
5000 - Other Operating Expenses and Services | $44,082 | $67,252 | 65.55% | $448,344 | 9.83% | $404,262 |
6000 - Capital Outlay | $0 | $17,881 | 0% | $119,204 | 0% | $119,204 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $5,421 | $5,499 | 98.58% | $36,660 | 14.79% | $31,239 |
Totals | $148,721 | $155,368 | 95.72% | $1,035,785 | 14.36% | $887,064 |
- Status
- Submitted
Merced CCD Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $44,299 | $27,041 | 163.82% | $90,138 | 49.15% | $45,839 |
2000 - Non-Instructional Salaries | $77,279 | $47,321 | 163.31% | $157,735 | 48.99% | $80,456 |
3000 - Employee Benefits | $71,496 | $43,313 | 165.07% | $144,376 | 49.52% | $72,880 |
4000 - Supplies and Materials | $16,039 | $11,798 | 135.94% | $39,328 | 40.78% | $23,289 |
5000 - Other Operating Expenses and Services | $94,474 | $134,503 | 70.24% | $448,344 | 21.07% | $353,870 |
6000 - Capital Outlay | $56,836 | $35,761 | 158.93% | $119,204 | 47.68% | $62,368 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $12,740 | $10,998 | 115.84% | $36,660 | 34.75% | $23,920 |
Totals | $373,163 | $310,736 | 120.09% | $1,035,785 | 36.03% | $662,622 |
- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Jessica Moran, Director
Merced CCD Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $44,299 | $40,562 | 109.21% | $90,138 | 49.15% | $45,839 |
2000 - Non-Instructional Salaries | $77,279 | $70,981 | 108.87% | $157,735 | 48.99% | $80,456 |
3000 - Employee Benefits | $71,496 | $64,969 | 110.05% | $144,376 | 49.52% | $72,880 |
4000 - Supplies and Materials | $16,039 | $17,698 | 90.63% | $39,328 | 40.78% | $23,289 |
5000 - Other Operating Expenses and Services | $94,474 | $201,755 | 46.83% | $448,344 | 21.07% | $353,870 |
6000 - Capital Outlay | $56,836 | $53,642 | 105.95% | $119,204 | 47.68% | $62,368 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $12,740 | $16,497 | 77.23% | $36,660 | 34.75% | $23,920 |
Totals | $373,163 | $466,103 | 80.06% | $1,035,785 | 36.03% | $662,622 |
- Status
- Unsubmitted
Merced CCD Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $44,299 | $54,083 | 81.91% | $90,138 | 49.15% | $45,839 |
2000 - Non-Instructional Salaries | $77,279 | $94,641 | 81.65% | $157,735 | 48.99% | $80,456 |
3000 - Employee Benefits | $71,496 | $86,626 | 82.53% | $144,376 | 49.52% | $72,880 |
4000 - Supplies and Materials | $16,039 | $23,597 | 67.97% | $39,328 | 40.78% | $23,289 |
5000 - Other Operating Expenses and Services | $94,474 | $269,006 | 35.12% | $448,344 | 21.07% | $353,870 |
6000 - Capital Outlay | $56,836 | $71,522 | 79.47% | $119,204 | 47.68% | $62,368 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $12,740 | $21,996 | 57.92% | $36,660 | 34.75% | $23,920 |
Totals | $373,163 | $621,471 | 60.05% | $1,035,785 | 36.03% | $662,622 |
- Status
- Unsubmitted
Merced Co. Office of Education
Merced Co. Office of Education Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $55,751 | $30,743 | 181.34% | $204,956 | 27.2% | $149,205 |
2000 - Non-Instructional Salaries | $12,498 | $11,804 | 105.88% | $78,692 | 15.88% | $66,194 |
3000 - Employee Benefits | $22,796 | $21,016 | 108.47% | $140,105 | 16.27% | $117,309 |
4000 - Supplies and Materials | $1,199 | $3,650 | 32.85% | $24,334 | 4.93% | $23,135 |
5000 - Other Operating Expenses and Services | $3,056 | $5,766 | 53% | $38,440 | 7.95% | $35,384 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $4,765 | $3,649 | 130.58% | $24,327 | 19.59% | $19,562 |
Totals | $100,065 | $76,628 | 130.59% | $510,854 | 19.59% | $410,789 |
- Status
- Submitted
Merced Co. Office of Education Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $108,499 | $40,991 | 264.69% | $204,956 | 52.94% | $96,457 |
2000 - Non-Instructional Salaries | $26,897 | $15,738 | 170.9% | $78,692 | 34.18% | $51,795 |
3000 - Employee Benefits | $56,732 | $28,021 | 202.46% | $140,105 | 40.49% | $83,373 |
4000 - Supplies and Materials | $5,516 | $4,867 | 113.34% | $24,334 | 22.67% | $18,818 |
5000 - Other Operating Expenses and Services | $10,926 | $7,688 | 142.12% | $38,440 | 28.42% | $27,514 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $10,428 | $4,865 | 214.33% | $24,327 | 42.87% | $13,899 |
Totals | $218,998 | $102,171 | 214.34% | $510,854 | 42.87% | $291,856 |
- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Mary Whited, Coordinator
Merced Co. Office of Education Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $108,499 | $51,239 | 211.75% | $204,956 | 52.94% | $96,457 |
2000 - Non-Instructional Salaries | $26,897 | $19,673 | 136.72% | $78,692 | 34.18% | $51,795 |
3000 - Employee Benefits | $56,732 | $35,026 | 161.97% | $140,105 | 40.49% | $83,373 |
4000 - Supplies and Materials | $5,516 | $6,084 | 90.67% | $24,334 | 22.67% | $18,818 |
5000 - Other Operating Expenses and Services | $10,926 | $9,610 | 113.69% | $38,440 | 28.42% | $27,514 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $10,428 | $6,082 | 171.46% | $24,327 | 42.87% | $13,899 |
Totals | $218,998 | $127,714 | 171.48% | $510,854 | 42.87% | $291,856 |
- Status
- Unsubmitted
Merced Co. Office of Education Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $108,499 | $81,982 | 132.34% | $204,956 | 52.94% | $96,457 |
2000 - Non-Instructional Salaries | $26,897 | $31,477 | 85.45% | $78,692 | 34.18% | $51,795 |
3000 - Employee Benefits | $56,732 | $56,042 | 101.23% | $140,105 | 40.49% | $83,373 |
4000 - Supplies and Materials | $5,516 | $9,734 | 56.67% | $24,334 | 22.67% | $18,818 |
5000 - Other Operating Expenses and Services | $10,926 | $15,376 | 71.06% | $38,440 | 28.42% | $27,514 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $10,428 | $9,731 | 107.16% | $24,327 | 42.87% | $13,899 |
Totals | $218,998 | $204,342 | 107.17% | $510,854 | 42.87% | $291,856 |
- Status
- Unsubmitted
Merced Union High
Merced Union High Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $150,086 | $113,886 | 131.79% | $759,240 | 19.77% | $609,154 |
2000 - Non-Instructional Salaries | $143,586 | $59,790 | 240.15% | $398,601 | 36.02% | $255,015 |
3000 - Employee Benefits | $108,306 | $65,061 | 166.47% | $433,739 | 24.97% | $325,433 |
4000 - Supplies and Materials | $5,242 | $14,906 | 35.17% | $99,372 | 5.28% | $94,130 |
5000 - Other Operating Expenses and Services | $11,026 | $22,083 | 49.93% | $147,219 | 7.49% | $136,193 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $13,787 | 0% | $91,910 | 0% | $91,910 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $418,246 | $289,512 | 144.47% | $1,930,081 | 21.67% | $1,511,835 |
- Status
- Submitted
Merced Union High Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $330,868 | $227,772 | 145.26% | $759,240 | 43.58% | $428,372 |
2000 - Non-Instructional Salaries | $277,280 | $119,580 | 231.88% | $398,601 | 69.56% | $121,321 |
3000 - Employee Benefits | $234,610 | $130,122 | 180.3% | $433,739 | 54.09% | $199,129 |
4000 - Supplies and Materials | $18,031 | $29,812 | 60.48% | $99,372 | 18.14% | $81,341 |
5000 - Other Operating Expenses and Services | $145,378 | $44,166 | 329.16% | $147,219 | 98.75% | $1,841 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $43,945 | $27,573 | 159.38% | $91,910 | 47.81% | $47,965 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $1,050,112 | $579,024 | 181.36% | $1,930,081 | 54.41% | $879,969 |
- Status
- Submitted
Allocation Year Closeout: 2017-18
- I have reviewed the financial reports for my agency and confirm that all funds for this allocation year have been spent.
- 2017-18 Reverted Funds:
- $0
- 2017-18 Status
- Closed
- Submitting Authority
- Steven Hobbs, Principal, Merced Adult School
- Tina Valadez
Merced Union High Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $330,868 | $455,544 | 72.63% | $759,240 | 43.58% | $428,372 |
2000 - Non-Instructional Salaries | $277,280 | $239,161 | 115.94% | $398,601 | 69.56% | $121,321 |
3000 - Employee Benefits | $234,610 | $260,243 | 90.15% | $433,739 | 54.09% | $199,129 |
4000 - Supplies and Materials | $18,031 | $59,623 | 30.24% | $99,372 | 18.14% | $81,341 |
5000 - Other Operating Expenses and Services | $145,378 | $88,331 | 164.58% | $147,219 | 98.75% | $1,841 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $43,945 | $55,146 | 79.69% | $91,910 | 47.81% | $47,965 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $1,050,112 | $1,158,049 | 90.68% | $1,930,081 | 54.41% | $879,969 |
- Status
- Unsubmitted
Merced Union High Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $330,868 | $759,240 | 43.58% | $759,240 | 43.58% | $428,372 |
2000 - Non-Instructional Salaries | $277,280 | $398,601 | 69.56% | $398,601 | 69.56% | $121,321 |
3000 - Employee Benefits | $234,610 | $433,739 | 54.09% | $433,739 | 54.09% | $199,129 |
4000 - Supplies and Materials | $18,031 | $99,372 | 18.14% | $99,372 | 18.14% | $81,341 |
5000 - Other Operating Expenses and Services | $145,378 | $147,219 | 98.75% | $147,219 | 98.75% | $1,841 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $43,945 | $91,910 | 47.81% | $91,910 | 47.81% | $47,965 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $1,050,112 | $1,930,081 | 54.41% | $1,930,081 | 54.41% | $879,969 |